Skip to content

FOR MANUFACTURERS AND JOB SHOPS

The decisions that run the shop floor.

The shop floor is where the money is made, and a few daily decisions set how much: what runs on which line, in what order, with which material and how many people. In short: we take one of those, or one of the office processes around it, the one that costs you the most, make it faster and cheaper to run, and show you in your own numbers how long it takes to pay back. Nothing new to buy or log into.

Before we start, the quote tells you how long we expect it to take to pay back. At the end, we work it out again from the measured numbers.

WHAT YOU GET BACK

Payback, stated before and measured after.

We measure the process twice, the same way both times: once before we change anything, sitting with the person who does the work, and once at the end, from your own records. Not our estimate of what it saved. Your numbers.

Rules 01, 10, 12, 14

How long it takes to pay back, in writing, twice

The quote says how long we expect the work to take to pay for itself: our fee, set against what you save each month once the cost of running the AI in your own account is taken off (keeping us on afterwards is separate). That saving starts from what you tell us the process costs you today. If we do not yet know your volumes, the quote says so and we set the payback from the measurement. During the measurement we check it against the real numbers. At the end, we report the payback the measured numbers give. If it is longer than we said, the report says so. If the measurement shows it will not pay back, we tell you, and you pay for the measurement only.

Rules 01, 10, 12

Hours given back each month

How many hours the process takes your people today, and how many after. The difference is time your team gets back, shown beside what it costs to keep running.

Rules 01, 12

Cost of each one, before and after

What it costs today when a line stands waiting, to handle one purchase order or to produce one quote, and what it costs once the routine parts run on their own.

Rule 12

One line your board can check

What you spent, what it bought, and which numbers moved and by how much. If nothing moved, the report says that too.

NOT ANOTHER SYSTEM

Nothing new to log into. Nothing new to learn.

Nobody needs another system to log into. This is not one.

Rule 09

It works inside what you already use

We build inside the systems and email your people already use. Approvals arrive where they arrive today. Nobody in your business has to log into anything of ours.

Rule 02

We start with one process

One process, chosen with you and measured before anything is built. Further down, three we would look at first; the one that costs you the most each month goes first, and each says what it needs before it can start.

Rules 05, 06

Alongside your people before it does anything

Before it touches real work, it is tested on at least fifty of your own past cases, including the awkward ones, and it has to get every one right. Then it runs next to the person who does the job today, without changing anything, until the differences are below a level you agree. Every difference is checked. You decide when it goes further.

Rules 01, 14

Measured first, with an easy way out

It starts by measuring the process with the person who does it. If it turns out not to be worth fixing, we say so and you pay for the measurement only.

HOW WE WORK

How we work, in plain terms.

We have written down how we work, as fourteen rules, and published them. They cover what gets changed and what does not, what the AI is allowed to do and what it is never allowed to do, what has to be proven before anything goes live, who stays in charge, and how you reverse anything it records, without us.

Why it matters: anyone can buy AI today. What makes it work in a business is how carefully it is put in. Every promise on this page is one of those rules, so you can hold us to it, and any of them can go in the contract.

Five things to know.

Rules 03, 04, 07

Most of the work is not AI

We look at every step in the process and put it in one of four groups, in this order. Most steps end up as simple rules. AI is used only where something has to be read and understood.

  • Remove it: steps that only exist because of another step.
  • Make it a rule: matching, adding up, checking against a limit, entering it in the system. Same answer every time.
  • Let the AI read it: a letter, a statement, a delivery note, an application.
  • Keep it with a person: approvals, exceptions and anything with real risk, by the person who decides it today.

Rules 01, 02, 03, 05, 06, 08

Every process goes through the same steps

Nothing is skipped. The second process is quicker than the first because it reuses what the first one set up.

  • Look: watch the work as it really happens, with the person who does it, and measure it.
  • Test: try the new way on at least fifty of your own past cases, and it has to get every one right before it goes near live work.
  • Run alongside: next to your team, changing nothing, until the differences are below a level you agree, then a person approving anything unusual, then on its own. Everything it does is recorded.
  • Repeat: fixing one process shows you the next one worth fixing.

Rules 01, 06, 07, 08

It earns trust in stages

It does not start with any authority. Your team moves it from one stage to the next, not us, and at every stage it can be paused or undone.

  • Before: we measure how the process runs today.
  • Watching: it works alongside your team and changes nothing.
  • Approved: it handles the clear cases; a named person signs off anything unusual.
  • On its own: it runs, and everything it does is recorded and can be undone by your own people.

Rules 01, 12

Four numbers, before and after

We measure the same four things at the start and again at the end, from your own records, and they go in the contract.

  • How long each one takes, from start to finish.
  • What each one costs in people's time.
  • How many go through without anyone having to touch them.
  • How many hours a month the whole process takes.

Rules 09, 11

Your systems, your data

Everything is built inside what you already run, and your information stays with you.

  • Approvals arrive in email or wherever they arrive today.
  • Nobody logs into anything of ours.
  • The AI runs in your own cloud account, in Canada where available. The AI company keeps none of your data and never trains on it.
  • Nothing leaves your business without your say-so.
The fourteen rules, in full →

WHY NOT A CONSULTANT

Why not a consultant?

Two kinds of firms usually sell this work. Each does half of it.

Consultants

Understand the business. Guess at the technology.

  • Can draw the process. Cannot say which parts AI can safely do.
  • Cannot tell you what it will cost to run.
  • No way of testing it before it goes live.
  • Six months later: a nice report, and nothing running.

AI software vendors

Understand the technology. New to your business.

  • Put AI on top of the process as it is, problems included.
  • Have not sat in your office working out who owns a step.
  • Tie you to their own product, at their price.
  • Changing to something cheaper later means starting again.

Agent Forge Works

Both, in one room.

  • The people who work out what to change and the people who build it work together, in your office, next to the people who do the work.
  • Simple rules wherever they do the job, AI only where something has to be read, and the cheapest AI that passes the test on your own cases.
  • Measured in your numbers, before and after. If the measurement shows it is not worth it, we say so and you pay for the measurement only.
  • No software to buy, no licence, no monthly fees until a project is finished and measured, no strategy report.

THREE PROCESSES IN A MANUFACTURING BUSINESS

On the floor, and around it.

The first is the plan the floor runs on. The other two sit in the office around it, where a late confirmation stops a line and quotes go out late. They are our picture from the outside; sitting with your people would correct them. Each says what it needs before it can start.

The daily production schedule

Who it involves

The planner, the plant manager, the line leads and customer service.

When

Can go first. It runs on the reports and the planning spreadsheet you already use.

In one line

Today: the plan is rebuilt by hand in a spreadsheet each morning, and again each time something changes. After: the plan is worked out from the same files, with the orders at risk and the reason marked; the planner decides, and the floor gets one plan.

Today, as we picture it

  1. Orders, stock and sales history exported from the ERP

    Planner

  2. Copied into a spreadsheet

    Planner

    waits
  3. What runs, on which line, in what order: worked out by hand from rates and rules the planner knows

    Planner

  4. Plan sent to the floor

    Planner

  5. A rush order, a late delivery or a line down: the plan redone

    Planner and line leads

    ↺ back to the start
  6. A line stands waiting for material, or for a changeover nobody planned

    Line leads

    waits
  7. Customer service asks what will ship

    Customer service and planner

    waits

After

    • RuleExports read as they are, each morning and when something changes
    • RemovedCopying into the spreadsheet
    • AI readsA rush request or a supplier's delay arriving by email read and added
    • RuleThe plan worked out from your line rates, changeover rules and stock targets
    • RuleOrders at risk and lines short of material marked, with the reason
  1. A case the rules do not cover, or a choice between two customers: decided by the planner

    Person
    • RulePlan sent to the floor and to customer service, the way it is sent today
    • RuleA change in the day: the plan worked out again, with what moved
  2. A change that moves a customer's date: approved by the planner

    Person

Why it takes so much time

  • The rules are in the planner's head and a spreadsheet, not in the ERP: which line runs what, how long a changeover takes, what must ship first.
  • The plan is out of date an hour after it is made, and redoing it by hand takes the morning.
  • A poor plan does not show up as a cost of planning. It shows up as lines standing, overtime and late orders.

What we would measure

  • Hours from a change to a new plan on the floor
  • Cost of each day's plan, standing lines and overtime included
  • How many days the plan runs without being redone by hand
  • Hours a month across planning and the line leads

Purchase orders and supplier confirmations

Who it involves

Purchasing, production planning and receiving.

When

Can go first. It runs on your purchase orders and the confirmations that come back by email.

In one line

Today: every confirmation read by hand and compared to the order, changed dates typed in, late orders chased from memory. After: confirmations are read and compared on their own, a person decides what to do about a change, and nothing is chased from memory.

Today, as we picture it

  1. Purchase order sent to the supplier

    Purchasing

  2. Confirmation arrives by email, with its own dates and prices

    Purchasing

    waits
  3. Compared to the order by hand

    Purchasing

  4. Date or price differs: supplier or planning asked

    Purchasing and planning

    ↺ back to the start
  5. New date typed into the system

    Purchasing

  6. Late orders chased, when someone remembers

    Purchasing

    waits
  7. Goods arrive; receipt checked against the order

    Receiving

After

    • AI readsConfirmation read; dates, prices and quantities pulled out
    • RuleCompared to the purchase order
    • RuleMatches: date recorded on its own
  1. Date or price differs: to purchasing, with what it does to the schedule

    Person
    • RuleOverdue orders chased on their own, on a schedule
    • RemovedChasing from memory
    • RuleReceipt checked against the order and the confirmation

Why it takes so much time

  • Every supplier confirms differently, and the one line that changed is buried in the rest.
  • A changed date matters only against the production schedule, which lives somewhere else.
  • The order nobody chased is the one that stops the line.

What we would measure

  • Hours from confirmation received to recorded
  • Cost of handling each purchase order
  • How many confirmations need nobody to touch them
  • Hours a month across purchasing and planning

Quoting from a request and a drawing

Who it involves

The estimator, engineering when something is new, and sales.

When

Can go first. It reads the requests and drawings you already receive and prices from your own past jobs.

In one line

Today: each request read by the estimator, costed from memory and past jobs, typed into a quote. After: the request is read and the standard parts priced on their own; the estimator prices what is new, and nothing else waits for them.

Today, as we picture it

  1. Request arrives by email with drawings or a parts list

    Sales

  2. Passed to the estimator

    Sales

    waits
  3. Material, machine time and finishing worked out, from memory and past jobs

    Estimator

  4. Something new: engineering asked

    Estimator and engineering

    ↺ back to the start
  5. Quote typed up, checked, sent

    Estimator and sales

    waits
  6. Customer asks about a different quantity; priced again

    Sales

    ↺ back to the start

After

    • AI readsRequest and drawing read; parts, quantities, materials and dates pulled out
    • RuleStandard parts and quantities priced from past jobs and your rates
  1. Anything new, or a tolerance that matters: priced by the estimator

    Person
    • RuleQuote produced, with every quantity the customer asked about
    • RemovedPassing it from desk to desk
  2. Quote approved and sent

    Person

Why it takes so much time

  • Every request is different, and the estimator's knowledge is in their head, not in the system.
  • The same quote is priced again for every quantity the customer asks about.
  • A request that waits for the estimator is a job that goes elsewhere.

What we would measure

  • Days from request to quote sent
  • Cost of producing each quote
  • How many quotes go out without engineering being asked
  • Hours a month across sales and estimating

Our picture from the outside · no figures · to be corrected with your people

HOW WE CHARGE

Priced against what you get back.

The fee is fixed, and the quote tells you how long it should take to pay back. Every job is quoted after a first conversation, because the price depends on the size of the company, how complicated the process is and what it is worth to fix. The fee comes in writing.

Rules 01, 10, 12

Payback, stated before and measured after

The quote says how long we expect it to take to pay back: our fee against what you save each month once the cost of running the AI in your own account is taken off, starting from your own estimate of what the process costs today. If we do not yet know your volumes, the quote says so and we set the payback during the measurement. At the end, the report gives the payback your measured numbers show, beside what was spent, what it bought and which numbers moved. If nothing moved, the report says so.

Rules 01, 02, 14

One fixed fee, agreed before we start

One process, one fixed fee, with what we will measure agreed up front. It starts with the measurement. If it shows the process is not worth fixing, we say so and you pay for the measurement only.

Rule 10

The running cost is in the quote

We test several AI options on your own cases and use the cheapest one that does the job. Each has a hard spending limit it cannot go over. The running cost is in the quote and in the final report, next to the hours saved.

Rules 02, 13

After the project, staying on is up to you

If you want us to keep it running, that is priced on the saving we measured, checked again every quarter. It is offered, never required. The next process costs less than the first because it reuses what the first one set up, and it is priced only once you have seen the first one's results.

Rules 09, 13

You own what we build

The rules, the test cases, the record of everything it does and the instructions for running it all stay in your systems. No licence, and nothing of ours you have to keep paying for.

AFTER THE PROJECT

Keeping it running, if you want us to.

Every project ends with a handover and written instructions, and your own people can run it. Or you can keep us on. Here is what that covers, and how it is priced.

What it covers

Rules 05, 10

It keeps working when things change

A supplier changes how it confirms, a line's rate changes, or an AI provider changes its prices. We re-test it on your cases whenever something changes, and on a regular schedule when nothing has.

Rule 05

It gets more accurate over time

Every correction your people make is added to the test cases, so it gets better after the project ends instead of slipping.

Rule 07

Problems reach the right person right away

Anything unusual goes straight to the person responsible, with the reason, in email or wherever they work today. We keep watch on how often that happens.

Rule 10

Always the cheapest option that works

As AI options change, we re-test them. We only switch when a new one passes all your test cases, and we tell you.

One page a week for management

What it saved, what it cost, how long things are taking, and the one decision that needs making. Spending is tracked against budget.

Senior AI advice when you want it

Help choosing vendors, keeping AI spending in check, board updates and planning days. Without hiring someone.

How it is priced

  • Monthly, only after a project, never before one.
  • Tied to the saving we measured, checked again every quarter in your numbers, so it costs in proportion to what it returns.
  • Stop at any time and everything stays yours: the rules, the test cases, the record and the written instructions are all in your systems.

HOW YOUR TEAM TAKES OVER

Build the first one with us. Build the rest yourselves.

We could keep building these for you for years. We would rather build the first one with your people beside us, so they can build the next ones, and so that anything anyone in your business builds after that is done the same careful way, with someone in charge of it.

How that happens

  • We use a checklist tool of our own, the Workbench, that will not let a project move to the next stage until the last one is properly done. Steps are not skipped. In the rare case one is overridden, only we can do it and the reason is written down.
  • Your people are part of every stage of the first project: deciding what to change, choosing the test cases, the time running alongside, the written instructions. They do it with us, not watch us do it.
  • By the end, they can take the next process through the same stages themselves, in your own systems. Whether your people build the next one or we do is your choice.
  • The result is one consistent way of doing things instead of a scattering of one-off tools: everything tested the same way, owned by a named person, recorded in one place, and easy to switch when AI options change.

The stages, in order

  • The four numbers measured, before anything is built.
  • At least fifty of your own past cases, every one handled correctly, before it runs alongside your team.
  • Alongside your team until the differences are below the level agreed with you, before it does anything on its own.
  • Written instructions accepted by your person, before we hand it over.
  • The four numbers measured again, on the date in the contract. That is the end of the project.

The Workbench is ours and still being refined, and your people never need to log into it. It keeps track of the project, never your information. Your documents and records stay in your systems, and so does everything we build. Keeping us on afterwards is your choice, never required.

THE NEXT STEP

A short conversation about one process.

No presentation and no cost. We would ask about the work, not about AI: which process takes the most time today, who does it, how often, and where it gets held up. You get a rough sense of what it costs you, and an honest view of whether it is worth fixing. When it clearly is not, we say so then and there.

Book a call

20 minutes · no deck · no cost. Bring the work that piles up.